Port of Santos

São Paulo, Brazil

Max Depth: 15–16 m channel Peak Current: Estuarine tidal Application: Dredging & Siltation
📏15→16 mChannel deepening, 17 m target
💰R$617.9MApproved deepening contract
🟤250,000 m³Monthly entrance siltation
📊~46%Share of total siltation at Section 1
⛏️3M m³2025–2026 dredging plan
🏗️~13 kmLength of the quay front

The Port of Santos — Latin America's largest port complex — is engaged in a permanent war against its own sediment. Entrance siltation of 250,000 m³ a month meets a deepening program pushing the channel from 15 to 16 m: the current-measurement strategy here decides whether either battle is won.

01 THE SETTING

The Port of Santos sits inside an estuary that delivers a continuous supply of sediment from its hinterland rivers. The port complex stretches roughly 13 km along the channel, and its navigability depends on holding a dredged depth against a deposition rate that varies sharply by section and season — with summer rains and storm-surge events driving the worst pulses.

The result is a port where maintenance dredging is not a project but a permanent operating cost, run in seasonal campaigns with trailing suction hopper dredgers, backhoes and barges under an Ibama environmental license with real-time monitoring obligations.

💡 Key Insight: At Santos, where the sediment lands is a current-driven question. Deposition forecasts built on measured flow — not on historical dredging volumes alone — are what let the port concentrate its budget on Section 1 and time campaigns to the transport peaks.
Port of Santos
Port of Santos

02 WHAT THE DATA SHOW

Published sedimentation studies of the Santos channel describe a mechanism with a clear spatial signature:

  • Section 1 dominates — at the channel entrance, where maritime and fluvial processes meet, sedimentation averages about 250,000 m³ per month (~8.7 cm/month) — roughly 46% of the port's entire siltation budget.
  • The driver is estuarine tidal flow — tidal currents import and redistribute sediment continuously; storm surges amplify both transport and deposition, which is why campaigns cluster in summer and winter.
  • Maintenance is a treadmill — the port has held 15 m for about 14 years through seasonal campaigns; a July campaign alone removed roughly 400,000 m³, followed by bathymetric surveys confirming the restored depth.
  • Deepening changes the equation — published studies show deepening increases sedimentation rates and maintenance volumes, growing steeply with depth — the 15-to-16 m program must be paired with monitoring, or it buys depth it cannot hold.
💡 Key Insight: The 250,000 m³/month deposition is carried by the small difference between flood and ebb transport — a residual invisible to short surveys. Only long, self-contained current records reveal it.

03 WHERE CURRENTS THREATEN OPERATIONS

📉

Holding the new depth

Deepening to 16 m raises siltation rates exponentially; the port has at times been forced to reduce maximum drafts for safety — the data justifying that call must be defensible to the shipping lines that pay for it.

📅

Campaign timing

Deposition peaks seasonally and with storm surges; current records identify the transport windows so campaigns hit the peaks instead of chasing them.

🌫️

Plume & turbidity compliance

Dredging runs under Ibama license with real-time monitoring; current speed and direction determine where plumes go and whether contract turbidity thresholds hold.

🔍

Post-dredge verification

Bathymetry confirms depth, but current records explain why a section refills faster than modeled — the input that tunes the next campaign.

04 MEASUREMENT STRATEGY BY ZONE

ZoneRequirementApproach
Entrance Section 1Tidal currents driving the 46% depositionBottom-mounted 600 kHz moorings through the highest-siltation section
Channel wallReal-time flow for VTS and campaign windowsSide-looking horizontal ADCP, continuous cross-channel output
Outer channelThe maritime–fluvial transitionVessel-mounted 300 kHz transects where Section 1 sits
Turbidity & disposal stationsPlume tracking at the Ocean Disposal PolygonSingle-point current meters paired with turbidity sensors

05 THE OCEANTEK SOLUTION

Entrance moorings, channel-wall flow and calibration transects — the instrument set that keeps a deepened channel open:

Oceantek Oceantek Ocean-ADCP-600-FA4

Ocean-ADCP-600-FA4

Ocean ADCP · 600 kHz
  • 70 m profiling range
  • ±20 m/s, ±0.3% accuracy
  • Titanium housing to 6000 m
  • ≤10 W · self-contained ≥100 days

Role: moorings through the highest-siltation section, resolving the residual transport that drives deposition.

View product →
Oceantek HADCP-600

HADCP-600

Horizontal ADCP · 600 kHz
  • 90 m horizontal range
  • ±20 m/s velocity range
  • 20 m depth rating, wall mount
  • 2 horizontal beams + 1 vertical

Role: continuous cross-channel flow for VTS-style operations and dredging campaign windows.

View product →
Oceantek Ocean-ADCP-300-FA4

Ocean-ADCP-300-FA4

Ocean ADCP · 300 kHz
  • 160 m profiling range
  • 1–8 m cells
  • ±20 m/s velocity range
  • ≤10 W · PD0 output

Role: vessel transects resolving the maritime–fluvial transition where Section 1 sits.


View product →

At the turbidity and disposal monitoring stations, the OCEAN-SPCM single-point current meter pairs with turbidity sensors for long-term plume-tracking records at the Ocean Disposal Polygon grid.

06 FIELD NOTES

  • Time transects around plumes — dredge plumes are acoustically dense; surveys through them degrade. Schedule vessel work outside active dredging windows and treat the plume itself as a monitoring target via point stations.
  • Measure the residual, not just the tide — the deposition is carried by the small flood–ebb difference; long self-contained records are what reveal it.
  • Re-baseline after deepening — a deepened channel changes its own current regime and its own siltation pattern; post-deepening monitoring is a new measurement problem, not a continuation of the old one.
  • Keep instruments off the dredge track — trailing suction hoppers run precise lines; mooring positions must be coordinated with the campaign plan so the instrument that measures the dredge does not become its next obstruction.

🎯 Running a Dredging or Siltation Program?

Entrance moorings, channel-wall flow and turbidity stations — the instrument set that keeps a deepened channel open.